Article List
- 2016 CommunicAsia in SingaporeCommunicAsia is an information and communications technology (ICT) exhibition and conference held in Singapore. The annual event has taken place since 1979 and is usually held in June. The show customarily runs concurrently with the BroadcastAsia and EnterpriseIT exhibitions and conferences, all ofTrade Show July 29, 2020
- A Government Application CaseCustomer BackgroundThe data center of the project occupies two rooms in the office building, the floor height is 3.1 meters, and the available space under the beam is 2.8 meters. The total construction area is 260 square meters. It is divided into the following three functional areas:Main computer rSuccessful Case August 13, 2020
- Telecommunications Operators Data Centre Application CaseCustomer BackgroundThe total construction area of the project is about 9444 square meters, with a total of 2361 cabinets, with single and double row closed cold channels in layout, and cabinet-level water cooling in refrigeration.Customer requirements:1. Power supply should be adequate, dual-city poSuccessful Case August 13, 2020
- A Hospital Data Centre Application CaseCustomer BackgroundA large-scale comprehensive hospital with a history of nearly a century, 100 experts and trusted by people, integrating medical treatment, teaching, scientific research, prevention and health care. Now it has become a second-class first-level hospital with strong scale and functioSuccessful Case August 13, 2020
- A company Application Case in HangzhouCustomer BackgroundThe project is located on the fifth floor of the office building, with a total computer room area of 106.7 square meters, of which the main equipment area (cold passage placement area) covers an area of 84.7 square feet, which can be arranged with 11 server cabinets, 1 integratedSuccessful Case August 13, 2020
- A Road Transport Bureau Data Centre Application CaseCustomer BackgroundThe project is located in Zhejiang Province, the construction area of the computer room is about 76 square meters, including cabinet system, cold aisle closed system, intelligent power distribution cabinet, room-level air-conditioning system and computer room intelligent managemenSuccessful Case August 13, 2020
- Third-party data centre application caseCustomer BackgroundThe data center building of the project has a total of 6 floors, each with a floor area of about 220square meters, with a total data center area of about 1320 square meters.The first floor layout consists of 13 double-row closed cold channels, each consisting of 16 cabinets with 8Successful Case August 12, 2020
- 2016 Indonesia China machinery and Electronics Trade FairIndonesia China Machinery and Electronic products Trade Exhibition has been successfully held for 10 years, and has become the largest number of local Chinese enterprises to participate in, and has a greater influence on machinery and electronic products exhibition. At the 2015 exhibition, well-knowTrade Show August 03, 2020
- GITEX2019GITEX ("Gulf Information Technology Exhibition") is an annual consumer computer and electronics trade show, exhibition, and conference that takes place in Dubai, United Arab Emirates at the Dubai World Trade Centre. Its exhibitions in the Middle East have attracted numerous participants, most notablTrade Show August 03, 2020
-